The port basin
Built taking advantage of the long beach that started from the Capo di Faro and reached to the Polcevera shore, after the establishment of the "Autonomous Consortium of the Port of Genoa," which in 1927 approved in an assembly the enlargement of the port of Genoa with the construction of "five protrusions, 400 meters long and varying widths between 130 and 150 meters, in the water mirror of Sampierdarena, protected by means of an extension towards the west of the already existing dam defending the Lanterna basin and the construction of a pier at the mouth of the Polcevera.".